Cooper Industries Turbocompressor Division
1) West Assembly Bay Addition
This 25,000 sf addition project
involved detailed documentation of existing conditions to determine the
scope of selective demolition and the possible places to tie into the
structure and work-flow of the existing building.
|
|
|
2) South
Test Lab & Assembly Bay Additions
|
|